SEARCH MENU
Caspian Energy Journal Caspian European Club
Wednesday, 27 September 2017 14:00

SOCAR returns one well into operation

SOCAR returns one well into operation

As a result of repair works carried out at the Sangachal-Deniz-Duvany-Deniz-Khara-Zira oil field of Nariman Narimanov OGPU SOCAR’s Azneft Production Union returned well #717 to the operating well stock from the non-operating well stock. Its daily output at the headway interval ranging within 4,686-4,669m will be 107 tonnes of oil and 1.800 cubic meters of gas, Caspian Energy News (www.caspianenergy.net) reports with reference to the company's statement.

It should be noted that on the pier platform #618 there are currently 3 wells producing 37 tonnes of oil and 7,400 cubic meters of gas per day.

It bears reminding that in 2016 the powerful explosion occurred on the gas pipeline located on the 43rd kilometer of the Baku-Alyat highway in the Sangachal settlement of Garadagh district of Baku.

More details:  http://www.socar.az/socar/az/news-and-media/news-archives/news-archives/id/11078

Person in charge of the newsline: Fidan Isayeva 

Read 498 times
POWERED BY ZEYNURBABAYEV