SEARCH MENU
Caspian Energy Journal Caspian European Club
CASPIAN ENERGY NEWS
Most read
Wednesday, 13 September 2017 12:00

Pier overhauled at Neft Dashlari

Pier overhauled at Neft Dashlari

SOCAR has completed the major overhaul of a pier spanning between platforms #1167 and #1956, Caspian Energy News (www.caspianenergy.net) reports with reference to SOCAR.

During the repair of the 1,050-metre pier 364 piles, 133 beams, 120 trusses, 613 reinforced concrete slabs and 433 surface communications were installed. 1,200-metre fire-prevention water line was constructed at the site, and asphalt was laid at the area of 4,020 square meters.

All works were performed in compliance with modern safety and labor protection requirements. The site is expected to be put into operation in the coming days. 

More details: http://www.socar.az/socar/az/news-and-media/news-archives/news-archives/id/11045

Person in charge of the newsline: Fidan Isayeva 

Read 38 times
POWERED BY ZEYNURBABAYEV