SEARCH MENU
Caspian Energy Journal Caspian European Club
CASPIAN ENERGY NEWS
Most read
Friday, 19 May 2017 15:00

Minister: 5 mln tonnes of oil to be produced in Kashagan

Minister: 5 mln tonnes of oil to be produced in Kashagan

“About 5 mln tonnes of oil and 3.1bcm are planned to be produced at Kashagan this year. 2.2 mln tonnes of oil have been produced here within 4 months”, Minister of Energy of Kazakhstan Kanat Bozumbayev said, Caspian Energy News (www.caspianenergy.net) reports with reference to the Ministry of Energy of the Republic of Kazakhstan.

According to him, 11.8 mln tonnes of oil and 8 bcm are planned to be produced at Karachaganak in 2017. 4.3 mln liquid hydrocarbons were produced within 4 months which is 12% higher than the figures of the last year.

“27.5 mln tonnes of oil and 4.5 bcm are planned to be produced at Tengiz. 9.7 mln tonnes of oil were produced at Tengiz within 4 months of this year”, the Minister added.

More details:  http://energo.gov.kz/index.php?id=10838

Person in charge of the newsline: Fidan Isayeva 

Read 201 times
POWERED BY ZEYNURBABAYEV